Viproperty

Thu Thiem Zeit River

  • Project name: Thu Thiem Zeit River
  • Investor: GS E&C
  • Location: Belonging to Lot 3-3, 3-7, 3-11 Thu Thiem urban area, in front of Nguyen Co Thach street and Vong Cung Avenue, District 2, HCMC
  • Scale: 9125,8 m², 2 apartment blocks with 25 floors and 32 floors (250 luxury apartments) and two rows of low-rise apartments (4 floors) designed like townhouses - Commercial
  • Type of apartment:

Tower T1: 25 floors

  • 1 bedroom (50 - 53m²);
  • 2 bedrooms (90.55 - 97.17m²);
  • 3 bedrooms (125.8m²);
  • 4 bedrooms (181.1m²);
  • Duplex (215.71m²);
  • Penthouse (392.45m²);
  • Shophouse (200-300m²);

Tower T2: 32 floors

  • 1 bedroom (50 - 53m²);
  • 2 bedrooms (88.09 - 97.15m²);
  • 3 bedrooms (135.14m²);
  • 4 bedrooms (201.28m²);
  • Duplex (183.34m²);
  • Penthouse (373.4m²);
  • Shophouse (200-300m²);
  • Expected amenities: Parking lot, BBQ area, Commercial center, supermarket, Swimming pool, Rooftop restaurant, Community room, Gym & yoga room, spa services, Park, flower garden, 24/7 security to ensure absolute safety
  • Legal: Long-term ownership for Vietnamese, 50 years for foreigners
  • Estimated time of handover: Quarter 4/2023

The Thu Thiem Zeit project is located on three plots of land, 3.3, 3.7 and 3.11, belonging to functional area No. 3 in Thu Thiem's new urban area. The first subdivision of the project is developed on plot 3.11 with the name: "Thu Thiem Zeit River" and is about to open for sale in November. This can be said to be the turning point of the project in the current real estate market.

 

The location of Thu Thiem Zeit River is like the diamond of the area:

Thu Thiem Zeit River has a prime location when it is located at the intersection of Vong Cung and Nguyen Co Trach Boulevards. These are the two most important arterial roads of Thu Thiem, connecting the area quite conveniently. From the project location, residents easily connect traffic with the surrounding areas, which is highly convenient:

  • The north direction of the project is 45m Nguyen Co Thach street, with six lanes and wide sidewalks lined with trees on both sides.
  • Vong Cung Boulevard connects directly with Tran Nao and Mai Chi Tho streets to the west.
  • The East direction is the central lakeside route, the greenest and cleanest road in the area, with a large scale of up to 14ha.
  • The South is an internal road with a width of over 20m adjacent to other high-end projects in the area.

Preeminent utility ecosystem Thu Thiem Zeit River:

The project belongs to the high-class subdivision and is invested by GS Corporation Korea, a corporation with many years in the high-end apartment market, so the project facilities are incredibly classy, ​​bringing great experiences. Best for project residents.

When living in a high-class apartment in the Thu Thiem Zeit River project, residents will own outstanding utilities that can be mentioned as follows:

  • The green park gives residents the experience of being in harmony with green nature.
  • The commercial center provides residents with a full range of shopping, entertainment and culinary services.
  • The lobby lounge welcomes 5-star guests.
  • The gym is designed with modern equipment.
  • A high-class spa exclusively for Thu Thiem Zeit River residents helps to relax and improve the health and beauty of the residential community.
  • An overflowing swimming pool with resort-standard freshwater and saltwater areas brings exciting experiences for residents.
  • 24/7 security, continuous surveillance of surrounding areas, modern fire protection system to prevent possible risks.
  • A chain of restaurants and an outdoor barbecue area next to the pool and park provide an ideal space for residents who want to party with family and friends.
  • The spacious community room helps residents organize community activities.

Thu Thiem Zeit River Apartment Layout:

Tower T1: 25 floors

  • 1 bedroom (50 - 53m²);
  • 2 bedrooms (90.55 - 97.17m²);
  • 3 bedrooms (125.8m²);
  • 4 bedrooms (181.1m²);
  • Duplex (215.71m²);
  • Penthouse (392.45m²);
  • Shophouse (200-300m²);

Tower T2: 32 floors

  • 1 bedroom (50 - 53m²);
  • 2 bedrooms (88.09 - 97.15m²);
  • 3 bedrooms (135.14m²);
  • 4 bedrooms (201.28m²);
  • Duplex (183.34m²);
  • Penthouse (373.4m²);
  • Shophouse (200-300m²);

The policy of Thu Thiem Zeit River 

Customers who order products from the Thu Thiem Zeit River project will receive many attractive preferential policies, including bank loan support and instalment payments with flexible terms depending on their finances and a support period of up to 25 years.

Especially when customers deposit with a value of 200 million VND, they will be given priority to choose the most beautiful and outstanding apartments in the project. The payment value for Thu Thiem Zeit River is only 45% until the house is received.

Payment methods:

  • Deposit with 200 million customers will be given priority to choose the most beautiful apartments of the project.
  • Pay 10%, including VAT, when signing the sales contract.
  • Pay only 45% until you receive the house.
  • Receive the house and pay 50% in the third quarter of 2022.
  • Receive a pink book to pay the remaining 5% for full ownership.
  • Selling price in October 2022: Estimated $ 7000/m2, price does not include vat, calculated on built-up area
  • Phase 1: sells 100 units

 

Construction progress in October 2022:

VIPROPERTY CO.,LTD
Mua bán, Cho Thuê, Quản lý, Thiết kế & cung cấp nội thất căn hộ chung cư.
PURCHASING, LEASING, MANAGEMENT, FURNISHING APARTMENT
购买、出租、管理、设计与家具供应。
☎ Hotline: (+84) 986 888 100
✉️ info@viproperty.vn
-----------

Related

Critical projects with a total value of up to hundreds of trillions in the Hanoi sprint

Critical projects with a total value of up to hundreds of trillions in the Hanoi sprint

bdteam

Many critical projects in Hanoi City are being accelerated to be completed this year and in 2024. Specifically, the investment project to build cultural and social works in Hanoi, with an investment of more than 1,300 billion VND, with a scale of nearly 40,000 m2, is expected to be completed in 2024.

In the first 4 months of the year, traffic infrastructure was arranged at VND 22,000 billion

In the first 4 months of the year, traffic infrastructure was arranged at VND 22,000 billion

bdteam

The Ministry of Transport has disbursed nearly VND 22 trillion of public investment capital for transport infrastructure projects in the year's first four months. This figure is higher than the national average, reaching 23.2% of the plan assigned by the Prime Minister in 2023

The Prime Minister asked ministries and branches to join forces to remove difficulties in the real estate market

The Prime Minister asked ministries and branches to join forces to remove difficulties in the real estate market

bdteam

In Dispatch 469/CD-TTg, Prime Minister Pham Minh Chinh suggested that ministries, sectors and businesses... join forces to overcome difficulties and challenges to develop a healthy "Real Estate" market.

81,000 apartments in 355 commercial housing in Ho Chi Minh will be issued Pink Books in 2023

81,000 apartments in 355 commercial housing in Ho Chi Minh will be issued Pink Books in 2023

bdteam

The Department of Natural Resources and Environment document announcing 355 housing projects that have been appraised are eligible for certification. Accordingly, 81,000 products will be issued with pink books, including apartments, individual houses, offices, and shop houses....