Viproperty

HR3 Building - The new subdivision of the Eco Green Saigon project

The new subdivision of the Eco Green Saigon project, called HR3, has a panoramic view of Huong Tram Park and the 69-storey Grand Hyatt tower. This is a subdivision with a good location and view. The apartments in the HR3 building at Eco Green Saigon are 2-bedroom and 3-bedroom apartments with areas ranging from 57m² to 74m², ideal for young families of 3-4 people.

The products of the HR3 apartment are an ideal choice in an ideal location with internal views. The HR3 building at Eco Green Saigon has three basements for parking, two commercial floors, one utility floor, and 25 floors of high-class apartments.

Take a closer look at the design of the HR3 apartment at Eco Green Saigon.

Eco Green Saigon apartment has 10 to 11 units per floor, all with two viewing angles. Each building has three open sides with four views: District 1 Center, Huong Tram Park, internal park and swimming pool.

HR3 building at Eco Green Saigon - Floor plan

* HR3 Building at Eco Green Saigon - Floor plan

The design of HR3 aims to help maximize the function of the house and improve the ability to receive natural sunlight and wind so that the house is always cool and close to nature. There are two types of apartments, two bedrooms and three bedrooms. The building is equipped with solar control glass and noise cancellation to block UV rays to reduce heat absorption. Besides the green materials used for the building, such as SSK paint and soundproof Solar Control box glass, the apartments at HR3 are also fully equipped with world-class interior equipment such as Daikin or Samsung air conditioners, Teka kitchen equipment, Duravit sanitary ware, Hansgrohe / Grohe, Samsung 3-function magnetic lock, Otis elevator...

In addition, Xuan Mai Corp added that the apartments here are also carefully calculated by the design unit to optimize the function, so even though the usable area is not too large, it is still very airy. In particular, all rooms in the apartment have 4 to 5 windows, and the loggia welcomes natural light, sunlight and wind, bringing fresh air to all rooms.  Xuan Mai Saigon also uses four apartments on the 16th floor as a refuge room to ensure fire safety.

Detailed information about HR3 building at Eco Green Saigon:

  • Total area: 7553 m2
  • Number of floors: 28 floors
  • Three basement parking
  • Including 24 apartments/floor, eight elevators, two stairs

Floors 1 and 2 include:

  • Shophouses
  • apartment halls
  • Kindergarten

Floor 3:

  • Service area
  • Traffic, Engineering
  • Building management office
  • Community living area
  • Garden area
  • Swimming pool for adults
  • Children's swimming pool

Residents living at HR3 can experience the high-end system right at the foot of the building, not only with the ideal green living space but also with interconnected roads. With a sports field, swimming pool, gym and a variety of exercise equipment, the yoga room are always ready to meet the health training needs of residents.

In addition, the outdoor barbecue area, flower garden, grassy hills, and walking paths in the park are ideal places for the whole family to meet and relax after a busy working day. Residents in the project area can also meet the needs of entertainment, shopping, event organization and more. It also allows children to study safely in a high-quality educational environment such as Japanese schools, kindergartens, and Kim Dong Primary School.

VIPROPERTY CO.,LTD
Mua bán, Cho Thuê, Quản lý, Thiết kế & cung cấp nội thất căn hộ chung cư.
PURCHASING, LEASING, MANAGEMENT, FURNISHING APARTMENT
购买、出租、管理、设计与家具供应。
☎ Hotline: (+84) 986 888 100
✉️ info@viproperty.vn
-----------

Related

ViProperty opening event at the beginning of the year 30/01/2023

ViProperty opening event at the beginning of the year 30/01/2023

bdteam

After a Lunar New Year holiday ends, VIPers must bid green banh chung and crimson couplets farewell and return to their jobs. And to begin a new year, it is essential to worship the OPENING ceremony in order to pray for a fruitful year filled with success......

Viproperty Recap Christmas event December 24, 2022

Viproperty Recap Christmas event December 24, 2022

bdteam

Everyone is joyful and the holiday season is bustling. In this welcoming environment, VIProperty Ho Chi Minh branch employees and members shared many joyful moments over cups of hot chocolate and light tea...

Ho Chi Minh City People's Committee report Prime Minister about the progress of key transport projects

Ho Chi Minh City People's Committee report Prime Minister about the progress of key transport projects

bdteam

The Prime Minister worked with the People's Committee of Ho Chi Minh City on the progress of implementing key traffic projects: Ring Road 3, Ho Chi Minh City - Moc Bai highway, T3 - Tan Son Nhat railway station and two urban railway lines: Ben Thanh - Suoi Tien and Ben Thanh - Tham Luong.

Lancaster Legacy

Lancaster Legacy

bdteam

Multiculturalism, multi-identity and multi-experience are all unique characteristics of Saigon - the inspiration to create a high-class living at Lancaster Legacy....